 |
 |
| Angle aluminum makes it easy
to draw straight lines on a curved surface. |
Looking down inside the body
tube before the forward centering ring glue filet is added. |
 |
 |
| Fin can tube is cut into 4
quarters. |
The 2 black lug launch lugs
are added. |
 |
 |
| Inside the body tube after
glue filet is added to forward centering ring. |
Fin cans added to each
quadrant after being sanded to shape. |
 |
 |
| Eye screw is glued to payload
bulk head. |
Meanwhile the nose cone is
painted red and the payload section gets a coat of white. |
 |
 |
| Next, the red part of the
payload section is painted. Here, the painting of the payload and nosecone is completed. |
Masking off the main body
tube using plastic bags so the number 4 fin can be painted red. |
 |
 |
| Main body tube painted white
with one red fin per instructions. |
The coupler tube and bulk
head being prepared. |
 |
 |
| Bulk head glued to coupler. |
Coupler glued into payload
section. |
 |
 |
| The aft centering ring
inserted and ready to be glued. |
One foot from the payload
section the parachute is attached. |
 |
| My
"helper" standing next to the completed HV ARCAS. |